The object of this study is the final design of hydraulic works for the drainage of the highway and the secondary road network.
For the connection of road with the local network and the neighboring urban settlements, four new road interchanges are to be constructed and the existing one of Kremasti will be redesigned.
All drainage works for highway, design and construction of culverts and flood protection for the upper bridge decks are included.